This paper introduces system simulation technology into large-scale beam field production and uses the simulation software Arena (14.0) to construct a simulation model of the beam field production system considering the randomness of the actual beam field production process operation time. The relationship between the production efficiency of the beam yard and the working time system was studied. In this paper, the improvement in beam-making efficiency in the existing beam field that is achieved by the commonly used reinforcement pre-binding method in the existing beam field is analyzed and calculated, and the improvements in the production efficiency in the ordinary beam field and the intelligent beam field are quantitatively calculated and compared. The results show that (1) when the working time system is increased from 8 h/d to 12 h/d, the average occupancy time of the traditional beam-making pedestal is shortened by 11.5 h when the working time is extended by 1 h per day; (2) with the extension of the working time system, the advantages of the pre-binding method of reinforcement gradually decrease; and (3) the application of intelligent technology not only improves the production efficiency of the beam yard but also makes the beam yard’s production more flexible and more resistant to risks.