Abstract

In order to fulfil the expected increase in train traffic demand, Nederlandse Spoorwegen is making considerable investments in both expansion of infra-structure and in development of computer systems for better command of the production process. These systems encompass all processes involved with train traffic, and cover all phases, from planning to supervision. To enable a controlled and timely introduction of all systems involved, an overall architecture was developed. This paper describes the systems architecture and its parts.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call