Abstract

The lakes along the Yangtze River are important source of pollutants that ultimately flow from the river into the East China Sea. Bioremediation is a green technology used to treat polluted water in lakes along the Yangtze River. Life cycle assessment and a comprehensive water quality index are used to evaluate the potential environmental impacts of constructed wetlands (CWs), ecological floating beds (EFBs), and combined ecological floating beds (CEFBs). The results showed that the raw material acquisition, construction, and operation of the CWs, EFBs, and CEFBs accounted for 24.1%, 35.3%, and 40.6%, respectively, of the total environmental impact. The acquisition of raw materials to construct the bioremediation system accounted for 51.6% of the total environmental impact. Among the nine impact categories considered, the system's global warming potential was the largest. Among the three stages of the project (raw material acquisition, construction, and operation), construction had the largest impact on eutrophication (the eutrophic potential of the construction stage was the largest). Furthermore, the operation of the project reduced the human eco-toxicity potential. The evaluation of the water quality before and after implementing the project revealed that CEFBs purified the water more effectively than CWs and EFBs did, particularly with respect to the removal of the total phosphorus.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.