Abstract
We analyze the impact of population uncertainty on the socially optimum timing of a congestion-relief project in a linear monocentric city with fixed boundaries, where congestion pricing cannot be implemented. This project requires time to bear fruit but no urban land. Under certainty, we show that utility maximization is roughly equivalent to a standard benefit-cost analysis (BCA). Under uncertainty, we derive an explicit optimal threshold for relieving congestion when the urban population follows a geometric Brownian motion. If the time to implement the project is short, we show analytically that deciding on the timing of congestion relief based on a BCA could lead to acting prematurely; the reverse holds if project implementation is long and uncertainty is large enough.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.