Abstract

This paper investigates the scheduling problem in a two-stage flexible flow shop, which consists of m stage-1 parallel dedicated machines and a stage-2 bottleneck machine, subject to the condition that nl jobs per type l∈{1, …, m} are processed in a fixed sequence. Four regular performance metrics, including the total completion time, the maximum lateness, the total tardiness, and the number of tardy jobs, are considered. For each considered objective function, we aim to determine an optimal interleaving processing sequence of all jobs coupled with their starting times on the stage-2 bottleneck machine. The problem under study is proved to be strongly NP-hard. An O(m2Πl=1mnl2) dynamic programming algorithm coupled with numerical experiments is presented.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.