Abstract
Based on a background to the mould job shop, this paper considers a two-stage flexible flow shop scheduling problem subject to release dates, where the first stage is made up of unrelated machines and tasks have group constraint. The objective is to find a schedule that minimizes makespan in that flexible flow shop environment. For this problem, a mathematic model is formulated. Because this problem is NP-hard, an improved Palmer-based heuristic (denoted by MPL) is proposed. Based on MPL, a new heuristic (denoted by IMPL) is developed. In order to test the efficiency of the two heuristics, sets of examples are designed. Compared to the MPL, the performance of IMPL is more superior.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.