Abstract
One of the most challenging issues for the TBM (Test Blanket Module) testing campaign foreseen in ITER is the operation of TES (Tritium Extraction Systems). This is essential not only to prove the ability to manage correctly the bred tritium but also to validate and qualify the neutronic codes for the prediction of tritium production in view of their use in future fusion plants. Two are the European candidates to be tested in ITER: the HCPB (Helium Cooled Pebble Bed) TBM and the HCLL (Helium Cooled Lithium Lead) TBM. For both these TBM concepts the following points have been addressed in this work:a) the gas stream to be processed by TESb) the TES process flow diagramc) a first assessment of the required space
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.