Abstract

A field suction pile retrieval test was conducted inside the Okpo Harbor in southern Korea during the summer of 2003. A steel suction pile was used to install a permanent embedded anchor in the clay seafloor soil. After the embedded anchor was installed, the suction pile was retrieved using positive water pressure inside the pile. The field test provided detailed instrumentation on the relationship between the applied positive water pressure inside the pile and the resulting pile pullout. This paper describes the transition of the soil strength during the suction pile retrieval process.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.