Abstract

This paper addresses scheduling n jobs in a two-machine flow shop to minimize the total completion time, subject to the condition that the jobs are processed in the same given sequence on both machines. A new concept of optimal schedule block is introduced, and polynomial time dynamic programming algorithms employing this concept are derived for two specific problems. In the first problem, the machine-2 processing time of a job is a step increasing function of its waiting time between the machines, and a decision about machine-1 idle time insertion has to be made. This problem is solved in O(n2) time. In the second problem, the jobs are processed in batches and each batch is preceded by a machine-dependent setup time. An O(n5) algorithm is developed to find an optimal batching decision.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.