Abstract

This paper considers a two-machine flow shop scheduling problem with deteriorating jobs in which the processing times of jobs are dependent on their starting times in the sequence. The objective is to minimize the weighted sum of makespan and total completion time. To analyse the problem, we propose a mixed integer programming model, and discuss several polynomially solvable special cases. We also present a branch-and-bound algorithm with several dominance rules, an upper bound and a lower bound. Finally, we present results of computational experiments conducted to evaluate the performance of the proposed model and the exact algorithm.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.