Abstract
We address in this paper the two-machine job shop scheduling problem with a single server that sets up the jobs before they get processed on the machines. The server is only needed during the set-up and becomes free at the end of this phase. Moreover, the set-ups are non-anticipatory and the set-up times are sequence-independent. We seek a schedule that minimizes the overall completion time, also called the makespan. We propose several lower bounds to the problem and prove the NP-hardness in the strong sense of two restricted cases. In addition, we present a linear time algorithm for a special case. In order to solve the general problem, we develop a genetic and simulated annealing algorithms that use feasibility guaranteed procedures. An experimental study is carried out to analyze the performance of these meta-heuristic methods.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Similar Papers
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.