Abstract

The construction industry consistently grapples with challenges related to project delays, budget overruns and quality control, particularly in the residential sector. Critical Chain Project Management (CCPM) emerges as a promising approach to address these issues by integrating resources availability with project scheduling. This literature review explores the application of CCPM in residential construction, highlighting its effectiveness in improving time management and project out comes. By analysing existing research, case studies and practical examples the findings demonstrate that implementing CCPM can lead to significant reductions in project duration and enhancements in resource utilization. The review aims to provide insights into the unexplored areas of CCPM in scheduling, ultimately emphasizing its potential to transform time management practices in the construction industry.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.