Abstract

In the classical energy minimization problem, introduced in [24], we are given a set of n jobs each one characterized by its release date, its deadline, its processing volume and we aim to find a feasible schedule of the jobs on a single speed-scalable machine so that the total energy consumption is minimized. Here, we study the throughput maximization version of the problem where we are given a budget of energy E and where every job has also a value. Our goal is to determine a feasible schedule maximizing the (weighted) throughput of the jobs that are executed between their respective release dates and deadlines. We first consider the preemptive non-migratory multiprocessor case in a fully heterogeneous environment in which every job has a machine-dependent release date, deadline and processing volume and every machine obeys to a different speed-to-power function. We present a polynomial time greedy algorithm based on the primal-dual scheme that approximates the optimum solution within a factor depending on the energy functions (the factor is constant for typical energy functions of form P(z)=zα). Then, we focus on the non-preemptive case for which we consider a fixed number of identical parallel machines and two important families of instances: (1) equal processing volume jobs; and (2) agreeable jobs. For both cases we present optimal pseudo-polynomial-time algorithms.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.