Abstract

This paper studied on the underwater vibrating compaction technology of scattering-filling rubble stone layer. At HongKong-Zhuhai-Macao bridge project, in order to satisfy the project time limit, underwater vibrating compaction technology with hydraulic hammer instead of conventional dynamic compaction technology was used to tamp scattering-filling rubble stone layer with no dead angle in a short time. Owing to the shortage of engineering example, the theoretical analysis was needed before field application. In this paper, the rubble stone layer and the vibration system were simplified to a mechanical model. Vibration system’s work on rubble stone was obtained by mathematical derivation, and effects of parameters were analyzed. The result shows that work on scattering-filling rubble stone layer increases with the increase of system quality, equivalent damping, exciting force and angular velocity and decreases with the increase of equivalent stiffness, water stiffness and buoyancy.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.