Abstract

In HongKong-Zhuhai-Macao bridge project, about 4.8 kilometers stone bed underwater should be compacted to make it smooth and remove the excess settlement. Vibrating compaction method would be used to tamp the stone layer with no dead angle in a short construction period. This paper theoretical studied on vibrating compaction technology of scattering-filling rubble stone layer. Vibrating compaction system and stone layer were simplified to a mechanical model and the vibration equation was established. According to an interpolation table, a fitting formula of equivalent damping was given. Through rigorous mathematical derivation, this paper gave mathematical expressions of the vibration displacement, the vibration velocity and compaction work on stone layer. Both compaction work on land and compaction work underwater could be calculated by these mathematical expressions. Lastly, through a set of field test parameters, comparative analysis between compaction work on land and compaction work underwater was carried out. The result shows that the weakening effect of water on compaction work is poor.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.