Abstract

According to the actual requirement and the existing situation of the Warship Equipment Support, the article makes its main research on the People’s Armed Police Coast Guard, and describes the concept and connotation of the warship equipment support design. It proposes the life cycle design based on the supportability system engineering in order to make the later costs lower, which includes the Project stage, the Argument stage, the Design stage, the Usage stage, the Maintenance and Support stage and the Scrapped stage. Finally it summarizes the project and technological approaches which can realize the support target from the project demonstration phase to the using support phase. The warship equipment life cycle design aims at solving the generated problem of the system of systems support capability, and can improve the logistical support system, innovative the support model, enhanced the logistical support capability.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.