Abstract

To overcome the problems of poor convergence, high cost and long planning time of traditional methods, a source-network coordinated planning method of active distribution system based on linear constraints is proposed. Firstly, the objective function of source network collaborative planning of active distribution system is established, so as to build the source network collaborative planning model. Then, the system power balance, line power security and other constraints are analysed, and the line power constraints and node voltage constraints are transformed into linear constraints by sensitivity method. Finally, the artificial fish swarm algorithm is used to solve the model, and the output of the model is the source network cooperation planning result of the active distribution system. Experimental results show that this method achieves the convergence of the model solution algorithm in 30 times, the total planning cost is 3.512645 million yuan, and the planning time varies from 0.1 s to 0.5 s.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.