Abstract

The article analyses regulatory and technical documents that regulate the organizational and technological features of building production and establish the requirements for additional resource supply when developing a design and estimate documentation, depending on various climatic conditions of the winter period. Based on the assessment of the initial conditions, as well as the complicating factors of the production of works, taken into account as part of the current standards for winter appreciation, additional resource support for the production of work in the winter is justified. Additional resource support during winter work in areas exposed to winds with a speed of more than 10 m/s, as well as temporary heating and accelerated drying (outside the heating period) to eliminate the increased humidity of structures or work surfaces in the manufacture of finishing and other special works.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call