Abstract
The changeover time is a factor that greatly affects the lean production implementation in industry with make to order system. Large product variations and unpredictable quantity of orders will trigger some kind of production wastes if changeover time is done in a longer time. One industry with make to order system is printing industry. In general, to produce several types of products such as books takes quite a long time because of long production changeover process. The general problem faced is the delay in book’s production completion. Based on this problem, changeover time reduction is needed to overcome the delay of book’s production completion using single minute exchanges of dies (SMED) method. The SMED method is the method that separates the changeover activity into two, i.e. internal setup and external setup. The research shows that changeover time for printing workstation is 18 minutes 29 seconds, which consists of internal setup activities 14 minutes 37 seconds and external setup 4 minutes 33 seconds. By converting 45% of the internal setup activity into an external setup, then the setup time can be reduced. The initial setup activities performed when machine is stop, now can be done when the machine is running. In addition, a changeover process improvement also done using 5S method in workstation tools area so the internal setup time is reduced 46% becomes 7 minutes 59 seconds. Under these conditions, the printing industry can increase production by 2%.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.