Abstract

Changeover time is a time between last good product of a specific model, to a first good product of another specific model. During this changeover time, materials, equipment and layout can be changed and this causes non-value added activities. This study aims the reduction of changeover time losses in the sixth line of a worldwide factory which produces combi boilers. Before developing the solution alternatives, causes of time losses were determined. After that, solutions have been searched with process design improvements. A simulation model and decision support system were generated to set the differences between proposed and current situation. While developing solutions, for specific symptoms, various technics were used such as 5S, Lean Manufacturing methods and Quality Function Deployment. Based on these studies, the current situation of the assembly line during changeover process has been improved.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.