Abstract

A recent widely researched solution is slope stabilization using a row of piles. In this study, the effects of fixed-tip pile and the subsequent pile length reduction, which finally bring about a reduction in stabilization costs were considered. This paper, presents novel analyses that were carried out in static condition. The analyses were performed using the limit equilibrium (LE) method and shear strength reduction (SSR) method, which approve of one another. Fixing pile tip was an efficient and applicable method for stabilizing earth slopes and reducing pile length. Results of these analyses were acceptable and were properly consistent with the results obtained by other researchers. The process of fixing end of pile were also carried out experimentally, and a new method proposed for this purpose, besides its simplicity, is cost effective and practical. The result of this investigation shows the effectiveness of the proposed method, in which, fixing the pile tip could enhance factor of safety (FOS) up to 55 percent.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.