Abstract

The presented article describes the assessment of the capacity of the existing detention reservoir with an alternative proposal for raising the dam and constructing an emergency spillway. The subject of the investigation was the capacity of the river bed under the polder too. The calculations were performed by numerical 2D modelling in the HEC-RAS program. Morphology data were obtained from own in-situ measurements and based on publically available data – DTM (digital terrain model).

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.