Abstract

Target costing is an effective management technique that has been used in manufacturing for decades to achieve cost predictability during new product development. Adoption of this technique promises benefits for the construction industry as it struggles to raise the number of successful outcomes and certainty of project delivery in terms of cost, quality and time. Target value design is a management approach that takes the best features of target costing and adapts them to the peculiarities of construction. The concept of target value design is introduced based on the results of action research carried out on 12 construction projects in the USA. It has been shown that systemic application of target value design leads to significant improvement of project performance—the final cost of projects was on average 15% less than market cost. The construction industry already has approaches that have similarities with elements of the target value design process or use the same terminology, e.g. partnering and target cost contracts, cost planning, etc. Following an exploration of the similarities and differences target value design is positioned as a form of target costing for construction that offers a more reliable route to successful project outcomes.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.