Abstract

Target value design (TVD) is a management approach that applies target costing in the design and construction industry. TVD enables a project environment with favorable characteristics to generate value. However, because the TVD’s primary assessment is cost, target cost can be met without necessarily achieving the project’s full value. This research applies the action research approach to implement TVD in a housing project and explores the value generation of the project using a value analysis model (VAM) to study the balance between cost and value fulfillment in the product and design process. According to the results, even though the target cost was achieved, the desired value of the project was not achieved during the project design. However, there is a tendency to increase value over time to a greater extent in the product and not so much in the process. The main contributions of this study are the possibility of comparing cost and value, identifying the emphasis of product over process and cost over value throughout the TVD project. This study enhances the literature on project value generation and maximization, offering new knowledge for a better understanding of how to conduct a value analysis in combination with costing in TVD projects.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.