Abstract

The knowledge and deepening of the Lean Construction methodology, as well as its practical application in the construction industry in Spain, can produce great benefits and the general improvement of a process that continues to be anchored in anachronistic procedures for too long. It is necessary to divulge this methodology with greater intensity, so that once known, and with its positive effects in the matter of the Triple Constraint: Cost, time and quality, proven in other countries, will be applied in a generalized way in ours. We look at this article in a technique belonging to Lean Construction: Target Value Design. Like many other techniques Lean parts from its application in Toyota, in this case of Target Cost, and was used in the 70s by Taiichi Ohno with the name of Genka Kikaku, producing very good results for the Company in the matter of productivity and profitability. As with other Toyota Production System techniques, it was later incorporated to Lean Construction as Target Value Design to bring greater Value to the customer within a fixed Cost. We will see how the Target Cost can become the center of the project and the construction of the building to reach the values ​​required by the client.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.