Abstract

Two 5.5-L raceway open ponds were used to evaluate the removal of organic material and nutrients from wastewater. Algal-bacterial flocs were placed in the ponds to treat primary and secondary effluent. The organic loading rate ranged from 29 to 95 and 9 to 38 g sCOD m−3 d−1 for the reactor fed with primary and secondary effluent, respectively. The hydraulic retention time (HRT) gradually decreased in both reactors from 5.5 to 2.2 d during a period of 21 days, and after that, both reactors operated at an HRT of 1.1 d. A high biomass concentration of around 2.2 g L−1 was sustained using primary and secondary effluent after 130 days. The biomass, developed with both substrates was very active and completely removed organic material and nutrients in less than 12 h. The algal-bacteria biomass had excellent settling properties and could settle in less than 10 min.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call