Abstract

With the economic development and industrialization, the increasingly accumulated tailings ponds in China have become a great risk. Due to the difficulty of selecting proper site for a new reservoir in Yunnan, a sub-dam was built at the downstream original reservoir. This study explored the fracture development and progressive failure characteristics of the tailings reservoir area after capacity expansion based on a similarity experiment and the numerical simulation. The results showed that the primary cracks in the reservoir area were more than those at the top of the sub-dam. With the increase of the upper load, the primary cracks further developed and penetrated the whole sub-dam top, and the sub-cracks were then produced under the concentrate stress of the primary cracks. After the further development of the sub-cracks, the secondary cracks parallel to the primary cracks were formed on the outer slope of the sub-dam. The progressive failure of a tailings dam can be summarized as: the maximum shear stress was firstly generated at the toe of the slope or the top of the dam which then extended to the top of the sub-dam in the form of a curve and finally formed the failure surface by connecting with the primary fracture of the tensile plastic zone at the top of the dam. The study also found that in the process of tailings accumulation in the new reservoir area, tailings would form "back pressure slope protection" at the initial dam of the original reservoir, which not only effectively delayed the occurrence of shear failure, but also inhibited the generation and penetration of tensile plastic zone.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call