Abstract

Cementing quality can’t meet the requirements in deep and ultra-deep wells cementing because of many factors such as long open hole section, multiple pressure system, high temperature and high pressure. In order to solve the problem of cementing in deep and ultra-deep wells, retarder and fluid loss additive were studied, then the cement slurry system for deep and ultra-deep wells were developed and the performance was evaluated. The results show that the cement slurry has steady performance for high temperature, adjustable thickening time, less fluid loss, good settlement stability, and high compressive strength, all of which can meet the requirement of cementing in deep and ultra-deep wells. Pilot tests of this cement system were conducted in more than 30 wells in Shengli, Dagang, Liaohe, Jiangsu, Jilin and Offshore oilfield, cementing qualities of these wells were qualified, which indicates that comprehensive performance of this kind of cement slurry system can meet the technical requirements for deep and ultra-deep wells cementing, which provides the references for the deep and ultra-deep wells cementing in all of the word. Key words : Deep and ultra-deep wells; Cementing; Fluid loss additive; Retarder; Thickening time

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.