Abstract

The paper presents the structural analysis performed for the reconshuction design of the Old Bridge (Stari Most) of Mostar, in Bosnia Herzegovina. The bridge survived for more than 400 years, from 1566 till 1993, when it was destroyed by shelling, during the conflict between the Muslims of Bosnia and the Croats. The design was developed in 2000 and 2001 under the supervision of an International Commission of Experts. In the paper brief historical notices and information about topographic and geotechnical surveys and material tests are first given, then results of numerical analyses are presented. The main aim of the structural analysis was the assessment of the load bearing capacity of the bridge for all load cases prescribed by present European Recommendations. Numerical analyses allowed putting into evidence the excellent structural performance of the bridge. The fist stone of the bridge was laid on June 27,2002.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.