Abstract

This investigation demonstrated the occurrence of strain-shock associated with steels having discontinuous yielding and its effect on high pH stress corrosion cracking (SCC) under load-control (e.g., internally pressurized pipeline), instead of displacement-control, for the first time. Results showed that microcrack initiation in the plastic zone and microcrack coalescence to the main crack tip were the main growth mechanism in the early stage of crack growth, distinct from the generally believed stochastic initiation and coalescence mechanisms. Discontinuous yielding associated with strain-aging would create a strain-shock effect under load-control and substantially enhance the early stage crack initiation and growth.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.