Abstract

This paper proposes a short-term stochastic SCUC model that simultaneously schedules generating units’ energy and spinning reserve in presence of wind energy. It should be noted that system uncertainties, wind farm output uncertainties and power generators and lines outages are also considered in optimization process. The proposed stochastic SCUC model is formulated as a two-stage stochastic mixed-integer programming model. Performance of the proposed formulation is proved through test systems and the results are also presented.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.