Abstract
To solve the issue of inconvenient and dangerous manual operation during the installation and removal of the main pipe plugging plate in the steam generator in nuclear power plants, a ten-degree-of-freedom plugging robot was designed in the present study that includes a collaborative robotic arm coupled with a servo electric cylinder. By establishing a joint coordinate system for the robot model, a D-H parameter model for the plate plugging robot was established, and the forward and inverse kinematics were solved. The volume level approximate convex decomposition algorithm was used to fit the steam generator model with a convex packet, and an experimental simulation platform was constructed. Lastly, path planning was carried out by using the RRT algorithm, with the paths divided into three phases for analysis. The simulation results show that the path in the first stage is relatively smooth, and the parameter changes in each joint are relatively stable. The path in the second stage exhibits zigzagging, with the parameter change curve of joint 9 being particularly evident, and the path in the third stage still exhibits zigzagging—the parameter change curves of joints 3 and 10 are particularly evident. The results of the present study show that, although the paths show a certain degree of zigzagging in complex environments, the plate plugging robot is still able to automatically complete the plate plugging task while avoiding obstacles, which greatly reduces the risk posed to the operator when exposed to a high-radiation environment, in addition to having certain research and application value.
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have