Abstract
In this paper, the single-machine scheduling problems under the common and slack due date assignments are studied, where the actual processing time of the job needs to consider some factors, such as convex resource allocation, maintenance activity, and learning effects. The goal of this study is to find the optimal sequence, maintenance activity location, resource allocation and common due date (flow allowance). The objective function is (1) to minimize the sum of scheduling cost (including the weighted sum of earliness, tardiness and common due date (flow allowance), where the weights are position-dependent weights) and resource consumption cost, and (2) to minimize the scheduling cost under the resource consumption cost which is bounded. We prove that these problems can be solved in polynomial time.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.