Abstract

This paper deals with a single-machine resource allocation scheduling problem with learning effect and group technology. Under slack due-date assignment, our objective is to determine the optimal sequence of jobs and groups, optimal due-date assignment, and optimal resource allocation such that the weighted sum of earliness and tardiness penalties, common flow allowances, and resource consumption cost is minimized. For three special cases, it is proved that the problem can be solved in polynomial time. To solve the general case of problem, the heuristic, tabu search, and branch-and-bound algorithms are proposed.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.