Abstract

The ability of data recovery during communicational failures is one of the significant advantages of the wide area measurement system (WAMS) with hierarchical structure. For this purpose, in addition to the proper partitioning of the WAMS, the relative location of phasor measurement units (PMUs) and phasor data concentrators (PDCs) should be selected so as to maximize the reliability of the communication network. The aim of this paper is to develop an organized method for partitioning the WAMS as well as proposing a new algorithm for the simultaneous optimal placement of PMUs and PDCs. In the proposed method, first it is assumed that PMUs are installed at all of the system buses. Then, redundant PMUs will be omitted sequentially to provide the system observability with the maximum communication reliability. The IEEE 30-, and 118-bus systems are used to demonstrate the proposed algorithm. Contingencies such as PMU loss and line outage are considered in power system observability achievement. Finally, to show the applicability of proposed methods to real dimensional power systems, the IEEE 300-bus power system is also analyzed in the normal operating condition.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call