Abstract

The control chart is important in many fields. A residual control chart is a graph and statistical tool used to monitor a process or product. This study uses a new 2 k estimator with only a k estimator from (Yassin & Mohamed, 2022) and makes a comparison between them. Therefore, this study is made up of two parts. The first part deals with generating and real data following Poisson regression with respect to a multicollinearity problem and using ridge regression to solve it. The second part includes drawing a residual-based Shewhart control chart and calculating the Average Run Length. A sample of water was taken after treatment, and control charts were prepared after resolving multicollinearity problems in the relevant data via ridge regression.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call