Abstract
The Xiaowan Hydropower Project is located in the middle and lower reaches of the Lancang River in Yunnan Province, China. The arch dam of this project, with a height of 294.5m, is by far the highest dam of its type that has been completed in the world. The great water potential makes it necessary to assess the seepage behavior in the dam-foundation system. Due to the complexity of geological conditions and seepage control system, the research is full of challenges. In this paper, the finite element method (FEM) is adopted to simulate the three-dimensional seepage field. The initial flow method and the boundary pre-adjustment method are combined to obtain the seepage free surface and overflow surface under complicated boundary conditions. The hydraulic potential contours, seepage gradient, drainage discharges, and so on, are all analysed and the results show that the seepage control system is reasonable and effective. Furthermore, the results of the seepage field can provide suitable seepage load in the stress-strain and stability analysis for the dam-foundation system of Xianwan. At present, the project is in good operation.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.