Abstract

The study is conducted for the 3-D seepage field analysis and the seepage control measurements optimization of a hydropower project, which is located in Sichuan Province, China. The seepage control measurements are introduced in this paper. An equivalent method is adopted to simulate drainage holes and the approach of determining equivalent permeability coefficient is presented. The 3-D seepage field with seepage control system is analyzed comprehensively by the water head contours, uplift on the dam foundation, and so on. The necessities of setting the grouting curtain and the drainage holes are discussed respectively. Further the optimal design of the grouting curting and drainage holes of the dam foundation is studied. The results show that special attention should be paid to ensure the well-operation of the seepage control system and the optimization of decreasing the depth of the drainage curtains and grouting curtains properly can be considered.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call