Abstract

Based on the actual conditions of the project and related experience, the seepage model of diversion tunnel and its surrounding rock mass was built to analyze its seepage stability. The seepage field was calculated by using finite element method (FEM) and cut-off negative pressure method. Two typical cross-sections and working conditions were chosen to evaluate the seepage stability of the surrounding rock mass. According to the results, the seepage gradient is larger when one tunnel is filled with water while the other is empty. The maximum seepage gradient is less than the allowable seepage gradient, so the surrounding rock mass of the diversion tunnel can meet the demand of seepage stability.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.