Abstract

The paper presents modelling of construction project schedules using new method: Probabilistic Time Coupling Method III (PTCM III). It is presented in EXCEL application with a description of the calculation scheme. The correctness of the PTCM method was checked by comparison with the results obtained for the same data in the Risky Project Professional (RPP) program. As a result of the analysis, it was found that the PTCM III method is the closest to the RPP, taking into account the beta distribution of the probability of times. Mean absolute percentage error (MAPE) is less than 1%, so it can be assumed that the matching of these two calculation methods is excellent.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.