Abstract

Currently, there are many abandoned open dumping areas that were left without any proper mitigation measures. These open dumping areas could pose serious hazard to human and pollute the environment. The objective of this paper is to determine the risk assessment at the open dumping area after they has been closed using Monte Carlo Simulation method. The risk assessment exercise is conducted at the Kuala Lumpur dumping area. The rapid urbanisation of Kuala Lumpur coupled with increase in population lead to increase in waste generation. It leads to more dumping/landfill area in Kuala Lumpur. The first stage of this study involve the assessment of the dumping area and samples collections. It followed by measurement of settlement of dumping area using oedometer. The risk of the settlement is predicted using Monte Carlo simulation method. Monte Carlo simulation calculates the risk and the long-term settlement. The model simulation result shows that risk level of the Kuala Lumpur open dumping area ranges between Level III to Level IV i.e. between medium risk to high risk. These settlement (ΔH) is between 3 meters to 7 meters. Since the risk is between medium to high, it requires mitigation measures such as replacing the top waste soil with new sandy gravel soil. This will increase the strength of the soil and reduce the settlement.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call