Abstract

This paper discusses the resurvey conditions of the GPS horizontal network for WZ Bridge in Wanzhou District, Chongqing City, China. Through the adjustment of the observation data, this paper shows that using the short side as the lofting directed edge in high-precision lofting should be avoided. Further, resurvey results show that the control network accuracy can meet standard requirements. The control network can be used for precision measurement in the anti-collision facilities installation engineering of WZ Bridge, and can also be a reference for other engineering control networks in mountainous river areas.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call