Abstract

Natural environment, construction, transportation and other factors have a great impact on the construction process of modern residential buildings. The interaction of these factors is the reason for the uncertainty of concrete dam pouring environment, but the traditional method is not suitable for this uncertainty. Therefore, discrete event simulation (DES) is widely used in construction simulation, rather than actual construction. This is because most simulation models are created by professionals and require manpower and material resources. Even if there is a small change in the simulation process, it should be introduced into the simulation model to adjust in order to adapt to the new environment. With the help of DES technology based on BIM to construct the framework of concrete dam, this paper fully studies the relationship between concrete structure and BIM and the two-dimensional code technology, solves the problem of information expression, and plays an important role in the application of simulation technology in the research of construction progress and reasonable design of construction scheme.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.