Abstract
with the continuous expansion of the scale of distributed new energy grid-connected power generation in the distribution network and the continuous improvement of penetration rate, the problem of distribution network voltage out of limit caused by distributed new energy grid connected can not be ignored. This paper analyzes the basic principle of voltage out of limit caused by the connection of distributed new energy sources to the distribution network,and analyzes the factors affecting the reactive power and voltage of the active distribution network with distributed new energy sources through BPA simulation, The compensation effects of the distributed series reactor and distributed shunt reactor are compared.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.