Abstract
Abstract The conventional quality control method of earth-rock dam is insufficient to meet the requirements of intelligent and fine management of dam filling construction in the new stage. With the expansion of construction scale and the overall improvement in information technology level, the traditional compaction quality control methods no longer meet the demands of modern mechanized rapid construction or provide real-time compaction information for engineering contractors. In response to the current conventional design and construction schemes for earth-rock dams, an intelligent real-time monitoring system established in this paper for compaction construction of earth-rock dams. This system utilizes advanced Beidou high-precision positioning and navigation technology, vibration-sensing IoT technology, real-time processing of massive construction information, and BIM technology. It achieves real-time intelligent monitoring of key compaction processes in dam construction and refined management of unit engineering. The intelligent system established provides crucial technical support for the safe and reliable operation of water conservancy and hydropower projects. Simultaneously, it enables real-time, remote, and intelligent monitoring of dam construction processes, significantly enhancing the technological content and informatization level of water conservancy engineering construction.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Similar Papers
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.