Abstract
To accurately understand the deformation behavior of surrounding rock in the jiugongshan No.2 high ground stress tunnel and optimize construction parameters for improved efficiency, on-site monitoring was used to gather data on rock deformation and initial support contact pressure. A WOA-LSTM regression prediction model was proposed, and excavation advance depth was optimized using numerical simulation. The WOA-LSTM regression prediction model demonstrated high accuracy in tunnel deformation monitoring. The absolute errors between predicted and actual values of tunnel settlement and convergence at various measurement points average 2.53− 04 mm and 1.96− 04 mm, with relative errors averaging 2.15% and 2.34%. These results meet the requirements for guiding construction. Additionally, based on the results of numerical simulation calculations, when the step length is 12 m during the construction of high-stress tunnels using the benching method, excavation advances of 2 m and 3 m result in settlement and convergence increases of 35.1% and 63.4%, and 25.5% and 55.2%, respectively, compared to an excavation advance of 1 m. However, no sudden jumps in these values were observed, indicating that with a 3 m excavation advance, the integrity of the surrounding rock remains in good condition, effectively guiding safe and rapid construction methods.
Paper version not known (Free)
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have