Abstract
Study of bonded post-tensioned prestressed concrete construction technology, from materials, equipment, channel reservation, prestressed reinforcement material installation, concrete pouring, the prestressed tendons tension and grouting of anchor seal is described from the aspects of the construction of the link, the specific operation steps, summarizes the method of construction, improve the following prestressed concrete construction understanding.
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have