Abstract
The traditional anti-mischeck mode of regulation and control operation relying on the experience of dispatchers can no longer meet the needs of daily work. To solve the problems of poor actual operation effect and low anti-misoperation efficiency of the traditional anti-misoperation method due to the large number of tasks of the current distribution network, this paper optimizes the traditional anti-misoperation method and takes the distribution network of M power supply company as an example to design a new intelligent anti-misapplication method of operation ticket. First of all, this paper uses intelligent distribution network maintenance technology to overhaul the distribution network operation ticket application server in an all-round way. Based on real-time analytical constraints, combined with the power supply demand of urban distribution networks, this paper designs an intelligent anti-misoperation constraint mechanism for operation tickets. The experimental analysis shows that after the application of the proposed anti-error method, the qualified rate of the operation order scheduling tasks is more than 95. 6% and the error rate is less than 1. 1%, which shows that the anti-error method proposed in this paper has significant advantages and high feasibility.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.