Abstract

One high piers and long-span bridge in mountainous area is designed as three-span which is 106+200+106 meters. The superstructure is pre-stressed concrete continuous rigid frame, and the sub-structure is hollow thin wall piers among which the highest is 167 meters. Under the background of this bridge, this paper mainly introduces the designing and construction methods of high piers and long-span continuous rigid frame bridge in canyon area, with the expectation to be served as reference to design the similar bridges in the future.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call