Abstract
Aiming to Ronggui Bridge (RGB) on Guangzhou-Zhuhai Intercity Rapid Rail Transit (GZIRRT), long term deformation control of long-span pre-stressed concrete continuous rigid frame bridge with ballastless track was studied. Comparing with the non-controlled deformation, extend track laying six months later after bridge construction, reserve 48 post-tensioned cables in middle spans and tension 12 external tendons after tracking laying were all effective in decreasing the long term deformation of RGB with individual application. Taking bridge construction and railway service in consideration, applying the foregoing three measures in combination, deformation of RGB 20 years later after track laying was effectively controlled within 12.8mm in the side spans and 21.9mm in the middle spans, which is less than the deformation limitation of bridges with ballastless track. The combined measure has been adopted in the actual construction of RGB.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.